I think you maybe right. I do actually have an immersion controller with the clamp on the main incomer, just inboard of the 100A fuse. It must be using the solar as the total usage drops significantly in the summer (we have oil heating).
I will persevere withe the Vue2 and see if I can make some...
Hi all,
new member, please go easy…
As above, I have a 3.5kw installation on an outbuilding roof 25m from the house, connected by 6mm swa. All seems to be working great so far.
I have just installed a vue2 monitoring system to see where all that electricity is going. It is indicating that...