Recent content by mk1vanman

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. M

    Sp Energy Networks Kva Load Rating Form

    with you now yep, thanks! so if I say 50kva that would be suffice without them worrying im going to be asking for too much? thnaks
  2. M

    Sp Energy Networks Kva Load Rating Form

    hi, the form is in my possession mate, don't have it online? 20kva? im confused now, did you not say 70kva would be minimum for a 3phase installation?? sorry for cinfusion
  3. M

    Sp Energy Networks Kva Load Rating Form

    compressor is a 4hp 400v and works upto 10 bar or 150psi DOL start?? whats that? as far as I know its 8 x 6ft fluorescents no automated test lane starts per hour for air could be upto 5 and ramps would be similar id think? I do have a package from ramp company coming so can get full specs...
  4. M

    Sp Energy Networks Kva Load Rating Form

    Hi as title I have a form from SP Energy networks, they are asking for a rough load (kva) of the connections I require in my garage basically we are building an MOT station and a storage unit, both units will have 3phase brought into them. the mot station will have 2 x ramps and an air...
  5. M

    Rough quote?

    hello im looking for some advice on what i should be paying for a full rewire on a 2 bedroom flat, 50 years old its a secon floor flat, can some of you give me a rough guess of what it should cost me, all parts and labour, all advice appreciated! thank you