    Hiya To All

    Yeah the resettlement is going well, i have both 17th edtion, and PAT user and manager, looking at doing domestic installer in the new year, then looking to get a work placement to gain some experiance, as for the area , im settled in kent over near canterbury,
  2. S

    Temporary Installation Headache

    Hi thankyou for the advice, and no we we dont wait to kill someone, i missed of something about our system   we have what is called a PCLM, (protective conductor loop monitor) it starts from the genset and uses a second seperate earth spike, this is then transported down the cables with a...
  3. S

    Temporary Installation Headache

    When we work out our cable calcs we use the Ze of the genset from our genset hand book, then the R1/R2 of the cable from the table in the onsite guide to give us the Zs
  4. S

    Temporary Installation Headache

    BS7909 is the way we are going, one area we are unsure of is the Zs, when we record it, are we right to say it has to be by test and not just by calculation
  5. S

    Temporary Installation Headache

    Hi  Im currently in the forces and employed as a sparky, we currently use a system call LAPDS made by a company called blakley, when it comes to inspection and testing we have a headache. so, we use a generator as source, then distribute 3 phase down through modules to single phase to a final...
  6. S

    Hiya To All

    Hiya ive just joined, im a army electrician of some 22 years and will be leaving the sevices soon so joined to get some advice both technical and of course job hunting regards steve