Search results

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. E

    Steeling S/l & N

    ahhh you see i ran a out side light in 3 core and there is a 2 gang switch with the hall light and out side light..... so i used the spare from there n ran it to the light obis took feed to switch with N
  2. E

    Steeling S/l & N

    i have never done it b4, but in this case it was a lot easier to do that, than taking it from the fitting. don't like it my self but hey ;) as long at the L2 runs in line
  3. E

    Steeling S/l & N

    hii all, who has ever used a intermediate 3 way lighting circuit & instead of going on from the light to add an additional light but has taken the S/L from the last switch L2 & used that to switch the light on off ??
  4. E

    Notifying The Council Of Cu Change And Additional Garage Submain

    also why use 1.0mm up stairs and 1.5 down ?? and you got ur cooker on 6amp mob
  5. E

    Pv Layout

    found fault loose connection in the AC iso... silly PV installers oh and wasnt in the correct terminals
  6. E

    Pv Layout

    hi all, just rewired a house and they say the pv isn't working. even though we havnt touched it, not done any PV work so all help required. the ac isolator is on and the meter is flashing? how can this not be working?
  7. E

    Electrics In The Kitchen

    300 for a kitchen?? try 700-900 pounds . 300 is v cheap. ppl like that who do us out of work lol
  8. E

    Under Floor Heating Centre

    its the 4 core actuator M
  9. E

    Under Floor Heating Centre

    not yet i will be tomorrow. how can i send a pic
  10. E

    Under Floor Heating Centre

    i have tried that. i left the two cores out . but the actuator didn't open. iv called they said he will get some one to contact me, they don't know whats going on.
  11. E

    Under Floor Heating Centre

    gicamini or some thing. giacomini
  12. E

    Under Floor Heating Centre

    lol the 4 core actuators are not on the diagram.
  13. E

    Under Floor Heating Centre

    i understand how it works. i just can't see why there would be a 4 core actuator? surly the actuator only need 2 cores to switch it on?
  14. E

    Under Floor Heating Centre

    how can i post a wiring diagram?
  15. E

    Under Floor Heating Centre

    well the bloke who came to commission it today didn't even have a clue about it.. he said he has only seen 2 core actuators. do u think i may have to install a perm live feed to the brown and blue and use the grey and black as the switch wires? i need some one with a lil expereince in this. i...
  16. E

    Under Floor Heating Centre

    hello all, an under floor heating install has been put in a property.. it con sites of 5 zones for each room 1 manifold 1wiring centre 5 stats in each room we have ran a 3 core cable to each room from the wiring centre (ths is placed next to the manifold) another 3 core has been run to...
  17. E

    CCTV cable

    Hello all Completed a re wire last month and the bloke had his car broke in to. R8..... So he has bodged a 4 Chanel CCTV set. He has asked if I could do it properly lol No he has cut one cable it has 2 cores and an outer sheeth. Now I connected the cores and the outer sheath in a block and I...
  18. E

    Flood lighting

    Huh no. ATM there are 4 500w with each post I will be replacing with 2 metal helide fitting at each post.
  19. E

    Flood lighting

    Lol yes silly phone ---------- Post Auto-Merged at 23:29 ---------- Previous post was made at 23:26 ---------- I'm just wondering what the best option is. And to get a few ideals from you all. ATM there is 4 500w haligons
Top