  1. S60TEM

    Enquiry of Ze from DNO.......useless!!

    no problemo, I was just bemused to what they had done tbh! Needless to say, the quote for the remedial work is pretty hefty for these types of things that I found! I know what your saying Steps but the only way to get round it was to turn off every DB apart from one feeding the server...
  2. S60TEM

    Enquiry of Ze from DNO.......useless!!

    100% mate. Building is a very old stone built circa 1900's with no structural steel. The mains gas was in a small locked outhouse in the corner of the playground approximately 100 metre's from the main building and totally isolated from getting bonding to it, so the next closest place was...
  3. S60TEM

    Part-P Have your say questionnaire..

    yep, had mine from NAPIT. Done it and sent it back.
  4. S60TEM

    Enquiry of Ze from DNO.......useless!!

    there was no bonding mate! That went on my snagging list.
  5. S60TEM

    Enquiry of Ze from DNO.......useless!!

    It was a TNC-S system and to remove the cover from the side of the head to gain access to the MET you have to remove DNO Fuse number 3 on a three phase system. I couldn't have got an accurate reading elsewhere as from there the supply went straight into a main isolator wired in SWA then from...
  6. S60TEM

    Enquiry of Ze from DNO.......useless!!

    Thing is, the whole installation throughout the school was in metallic trunking and fed via SWA so I wanted an accurate Ze reading without any parallel paths from all the bonded metalwork etc. I agree that I didn't need to break the seal etc but as it hadn't been tested since 2001 on some of...
  7. S60TEM

    Enquiry of Ze from DNO.......useless!!

    thats what I was implying when speaking to them (the convo was a bit longer on the phone) but they were just clueless!
  8. S60TEM

    Enquiry of Ze from DNO.......useless!!

    OK, I have just completed a PIR on a first school the week before last and didn't want to break the seals which covered the earth terminal at the head (TNC-S) I decided that I'd give NEDL a call to get the Ze from them. Guess what they said to me?! DNO - "Sorry, WE don't hold any information...
  9. S60TEM

    Replacing a siemens DVA3 demountable Actuator

    well, think i'll get my plumber to come do it for me......don't like messing with water as much as he doesn't like messing with electrickery.
  10. S60TEM

    Replacing a siemens DVA3 demountable Actuator

    well i've changed the motor and its still doing the same........damn it! Looks like i'll have to replace the whole unit! Will I have to drain it all down to do it ?
  11. S60TEM

    Replacing a siemens DVA3 demountable Actuator

    Thanks for that mate! Much appreciated as it's exactly the same as whats used in the siemens actuator and the cheapest I could find that on the next was about
  12. S60TEM

    Replacing a siemens DVA3 demountable Actuator

    Hope someone can help. This morning we were awakened by a clunking noise coming from our airing cupboard, when I opened the door I found it was coming from the actuator. Its a SIEMENS DVA3. is there a way it can be fixed or is it just a replacement job? If its a replacement, whats involved...
  13. S60TEM

    need some advice on easiest way

    oh, and don't forget to take the extra cost out of the numpty's wages!! LOL
  14. S60TEM

    17th edition tester, which one to buy?

    and the other downside to the fluke is when the battery's start running low it is a "Fluke" that you'll get an accurate reading! The Megger on the other hand will just stop working and inform you that its the battery's.
  15. S60TEM

    17th edition tester, which one to buy?

    I've got a Megger but my brother in law has a Fluke. I like the functions of my Megger as it's simple to use and very clear whereas I think the Fluke is overcomplicated imo. The only downside to the megger is that it performs the tests a lot slower than the fluke.
  16. S60TEM

    Suitable circuit breaker / Approved electrician project (car workshop)

    if its in a car workshop the property may be 3 phase and would it not be best to run 8 lamps on each phase to balance them out which would give 2kW per phase and 8.7A so running a 10A for each phase would handle the current requirements aslong as the cable is sufficient? As for the breaker...
  17. S60TEM

    kitchen electrics quote

    I would have quoted around the
  18. S60TEM

    Part P changes possibly

    my house insurance is fine, I tested my house myself and got 9+ years before the next one :)
  19. S60TEM

    Pir

    I would have overprinted (watermarked) the first cert with the words "DRAFT COPY UNTIL PAID FOR IN FULL" and then NOT signed or dated the cert or put in your scam membership number. Then once paid, print out the proper cert, signed dated etc and posted.