Search results

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. B

    Bathroom fitters

    Tiling looks good tho.lol Have u there number,need a tiler.
  2. B

    KA RATING

    The easiest solution is to get 10ka rated mcbs throghout if you was worried about the impossible happening. But i would just go by the ka rating at the local db which if single phase will be lower than the 4.2 at the origin(6ka).Of course the 3 phase dbs will be lower than the 8.4 at the origin...
  3. B

    Wiring heating controls

    Thanks Guys for your replies .Sorry for the delay but once finishing the job yesterday it was pop time.So yes sore head this morning. The install went well yesterday,thanks mainly to coming on this forum .The diagram of rainydays was a much help and advice of special location was worthy. The...
  4. B

    Wiring heating controls

    Thanks Doc As you can tell new to this forum and your help much needed Thanks for starting new Question Much Appreciated. ---------- Post Auto-Merged at 19:47 ---------- Previous post was made at 19:39 ---------- Yes doc i am an approved electrical contractor and have been for nearly 20...
  5. B

    Wiring heating controls

    Andy, Thanks for getting back I have no wiring plans with the boiler. The boiler is solid fuel I have a cylinder with a stat on i have a low stat and a high stat in cylinder cupboard. i have wired a three core to a room stat in hallway. I have a drayton single channel programmer lifestyle...
  6. B

    Wiring heating controls

    Could someone put me in the right direction please. I have a solid fuel system with a charnwood solid fuel boiler ,a room stat,high stat,low stat,cylinder stat,single channel programmer and this normally open valve which is used on solid fuel systems. I have no idea how to wire all of them...
Top