I have a board with a GE Mcb series e. Which I understand is not available any more.
Does any one know if any of the new ones will fit the the board or can I use a different manufacture and if so which make
Looking for an electrician with a military background to work mainly in the SW London area. Qualifications need to be up to date and to have inspection and testing.
You must be hard working , be able to work as a team or on your own.
If you meet this criteria please contact...
This is a picture of the manual. I hope this helps.
She also doesn't know how to remove the tv from the wall mounted bracket any help or advice is greatly appreciated.
I have a customer with a samsung TV it appears to have a HDMI in and a HDMI out.
her sky box is plugged into the in port but she also wants to plug in her Apple TV also.
Is there such a thing as a double adaptor or splitter. Or can it be done.
It is a ring circuit downstairs. It's an elderly lady.
In her kitchen she just has 2 sockets outlets. One is in the middle of the wall. All she wants is 2 other sockets either side about 300mm apart. The rcd can be fitted right next to the c/unit.
I been asked to extended a ring main in a kitchen by 2 sockets. Because it is a kitchen and the cables are going to have to go horizontal. I need to fit a separate rcd.
What size cable do I bring from the c/unit. I think it's 6mm from the original fuse.
Thanks doc. Your right they should have. But I can't remember numbers to well. That's why I refer to osg. It gives you cable size against a standard breaker size eg 2.5 32A but not when you get to 6mm
I've been asked to install a new oven . It works our to be just over 10KW . The manufactures instruction say fit 32a mcb.
The csble size is 6mm. But can't see any max as in osg
I want to change my cu I am happy with the testing of circuits and checking all the bonding. But I'm not sure about the service head fuse.
By rights I know you should get the supplier to break the seal and then replace it. But I suspect they wouldn't come back on the same day.
So do I cut...
Theory was still going to keep 2 cct. The customer is renting the property out. I hear what you are saying about future proofing but I think the customer will always get some one in to do the electrics. Not the type to get his hands dirty if you know what I mean. Also doesn't want to spend any...
Pro dave I was concerned about the loading
Theroy I was thinking setting out the lights was going to be a real pain. Then there is a lot of connecting.
So you both think I could do it all in 1mm. That would be great if I could be a bit cheaper and all the existing cable is 1mm save a bit of...