Search results

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. R

    Help with G99 commissioning forms

    Hi, My system is installed, and now I need to complete the form attached, and send in a schematic etc. Hopefully I have the correct form, my system is an existing 3.68kw system installed in 2015, and my Victron system (PV with DC battery) installed recently. Presumably I need to list both...
  2. R

    New consumer unit required - does it mean none fire rated down lighters need replacing?

    I've got a couple of sparks here doing the AC side of my solar install. As we're re-routing the entire house feed through the inverter (Quattro 48/10000) I've been told that the consumer unit needs replacing, its a split load unit fitted in circa 2005 so not up to current standards. We did...
  3. R

    Running PV cables through isolators and combiner boxes?

    I'm starting to mount all my equipment on the wall, my electrician is extremely slow to respond, and its easier on here any way. This is my planned layout: I have four DC isolators, one for each string. Is it acceptable to route the PV cable through one isolator, to the next, then out of...
  4. R

    Additional solar array and addition of a battery

    We have an existing 4kw array, using Solarworld 250W panels, and Soleredge inverter (SE4000-16A) and power optimisers, which was installed in December 2015, so we get reasonable FITS payments. This array takes up all suitable roof space on the house, there are two more roofs, but they are NW and...
  5. R

    New Solaredge/solarworld Install Questions

    Hi all, I'm an extremely keen diyer (just Google Ronskis cinema to see some of my work), so it's not often that I get trades in to do work, and when I do I want to be sure the jobs been done correctly to a good standard. I've been reading quite a few of the threads in the PV section over the...
Top