Search results

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. R

    Village hall heating.

    Thanks Binky. 90%+ of the time the building is shut down and any warm moist air (I would think) would be vented above the suspended ceiling around 5 metres high hopefully keeping the walls slightly warm when we do get a little winter sun. It is not to heat the building just to give the oil...
  2. R

    Village hall heating.

    Thanks Murdoch I did think of that but if the panels were running nothing else? Its an idea that would have to be tested but maybe not by me; I could finish up in the village stocks!!
  3. R

    Village hall heating.

    We have a large, high ceiling village hall with oil boiler and rad heating. The hall is very old with solid stone walls 600mm thick. It is impossible to heat and stop condensation on the cold walls. I had the idea of solar panels permanently running electric skirting rads which would in time...
  4. R

    Back box too full for light switch to go on?

    I am not an electrician but I have ben in the building trade all my life. and seen many burnt wires in terminals. When cables are secured and pushed into the box I find it good practice to ease the whole assembly (switch etc) forward so that any losening of connection with the initial push and...
Top