Search results

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. A

    Help

    Yes I am going to fully working machine Thusday I will take reading on neutral and post, The fault appeared after short time burning out the neutral cores on toledo Transformer.
  2. A

    Help

    They are 3 seprate 230 volt single phase circuits circuits How is there no current in neutral ? Thanks Roys It Has all come Back Your a star Thanks
  3. A

    Help

    They are 3 seprate 230 volt single phase circuits circuits How is there no current in neutral ? Yes controlled via Stats but both running most of time as water is drawn when machine in use most of day
  4. A

    Help

    2 x 3kw elements 1 x2.2kw motor single phase 1 Toledo transformer for pcl supply 2 x .75kw heaters all fed via relays, contactors
  5. A

    Help

    Can you supply a machine with L1, L2 and L3, using a 3 phase supply to feed 3 seprate 230 volt cicuits. The total load is 38amp spread over the 3 phases. My concern is that they are all relying on the single nuteral core. It is 1.5mm, 4 core SWA over a distance of approx. 22 meters via a 3 pole...
  6. A

    periodic test on a petrol station

    I work On filling stations testing this is my main line of work, The best advise I can is obtain a UKPIA card and then enroll for Compexe training Most filling stations require you to have the UKPIA (Main filling stations Total Shell BP etc) This is not the case on private sites rented from one...
  7. A

    choosing cameras for cctv

    Check this site Iview cameras
  8. A

    Terminating swa picture guide

    Use a Bladerunner SWA Stripper
  9. A

    Car Wash

    All car wash & Jet wash bays on filling station sites are required to be tested on the yearly inspection to obtain there Petroleum License however this year on certain sites IE Total you only have to test and inspect if the supply passes through the hazardous zone
Top