4- A final circuit is installed using single core, PVC insulated, copper cables in steel conduit. The steel conduit is used as the CPC. When an earth fault loop impedance test is carried out the result exceeds the maximum acceptable value of Zs. Describe
a) Three possible faults that may cause the high reading
B) One test that may be applied to locate the fault
5-a) Explain why, in the sequence of tests required by BS7671, the continuity of protective conductors must be completed first.
B) BS7671 requires that a polarity test is made in order to verify three requirements. State each of them
can someone help me please answer this ????
a) Three possible faults that may cause the high reading
B) One test that may be applied to locate the fault
5-a) Explain why, in the sequence of tests required by BS7671, the continuity of protective conductors must be completed first.
B) BS7671 requires that a polarity test is made in order to verify three requirements. State each of them
can someone help me please answer this ????