Turned into a nightmare.........
Left my 2 helpers (one does know what he's doing or is supposed to) up the 5mtr tower scaffold to run in circuit for 7x smart floods, while I traced a L/E fault on ringmain at same property & moved another (freezer x4) circuit to its own rcbo.
Came to testing new flood lighting circuit just as the light was fading ............... f***ing fault on circuit.... Think the lads have probably pinched cables when screwing in conduit dome plates to boxes
Will have to set up the tower again in the morning...on my own... :_|
I hate winter not enough hours in the day ..... oh well suppose I'd better have Guinness
Left my 2 helpers (one does know what he's doing or is supposed to) up the 5mtr tower scaffold to run in circuit for 7x smart floods, while I traced a L/E fault on ringmain at same property & moved another (freezer x4) circuit to its own rcbo.
Came to testing new flood lighting circuit just as the light was fading ............... f***ing fault on circuit.... Think the lads have probably pinched cables when screwing in conduit dome plates to boxes
Will have to set up the tower again in the morning...on my own... :_|
I hate winter not enough hours in the day ..... oh well suppose I'd better have Guinness