avinalarf
Senior Member
- Joined
- Jun 2, 2008
- Messages
- 415
- Reaction score
- 0
Is someone able to explain to me (preferably with a diagram, if possible) how electricians use the switches for their feed cables please Blushing.
I've just come across this, which I believe to be an older way of doing things. The spark obviously didn't have any 3-core as he used 2 x T&E for the 2-way switching! I've got the landing light to work, but it can only be controlled by the landing switch and not the one downstairs.
I'm sure I 've done something wrong in the landing switch, but am not sure what!
I've been trying to draw it out myself, but want to make sure it's correct before I return to the client.
Thank you.
I've just come across this, which I believe to be an older way of doing things. The spark obviously didn't have any 3-core as he used 2 x T&E for the 2-way switching! I've got the landing light to work, but it can only be controlled by the landing switch and not the one downstairs.
I'm sure I 've done something wrong in the landing switch, but am not sure what!
I've been trying to draw it out myself, but want to make sure it's correct before I return to the client.
Thank you.