Certifying A Temp Suppy To Portacabins
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Essex1" data-source="post: 406980" data-attributes="member: 25368"><p>If these are for the construction site offices etc then as long as they are not moved then they do not require re-testing every 3 months. The 3 month re-test period is only for the parts of the installation that is actually going out to the construction site such as site lighting and transformer supplies. The site offices do not fall under the 3 month time frame as these should be installed as if they are permanent anyway due to the nature of their use.</p></blockquote><p></p>
[QUOTE="Essex1, post: 406980, member: 25368"] If these are for the construction site offices etc then as long as they are not moved then they do not require re-testing every 3 months. The 3 month re-test period is only for the parts of the installation that is actually going out to the construction site such as site lighting and transformer supplies. The site offices do not fall under the 3 month time frame as these should be installed as if they are permanent anyway due to the nature of their use. [/QUOTE]