corridor lighting from scratch

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

bernard41

Junior Member
Joined
Aug 3, 2011
Messages
7
Reaction score
0
If you were starting from scratch with corridor 24hr lighting in an apartment block

what i best, 2d lamps,led lamps, pir switching, individual battery packs in lights, or a cental battery back up, could be a job for the best soluion

 
You said 24 hour so not PIR switched, so energy saving lamps , take your pick. Light levels could be reduced during the night , give that some thought .

if its a biggish job get a ligting rep involved and take his advice .

Emergency fitts with own batts .

 
the reason i posted this is because i have a totally unreliable system with 2d bulbs with the emergency and non emergency keep going,I am told pir is not suitable and i thought the lads who work on the ground might have more practical advice that a sales rep. I am looking to start from scratch

 
Frequent PIR switching of 2D lamps shortens lamp life. It is recommended mimimum 15 Min duration.

 
Difficult to provide definitive advice without the input from the RA; FRA, etc. - there may be specific requirements for certain areas of your building; above & beyond the normative measures to comply with the regulations.

Be aware that CBS for em. lights are required to be high integrity wiring throughout; including final connections to fittings, and fittings themselves. Generally self contained is the better option.

Need more info......

KME

 
I would use push switches with 10 min delay on a 2 way/intermediate set up and 2D fittings and 2D batt back up ones. simple and cheap and if you set them for 15 mins then thats good for the tubes too....

 
What did you mean by the phrase "24 hour" Bernardo, ? I took that to mean lights are on permamently.

If you're switching them I'd go with the Rev's suggestion , and 2D fittings.

If you go with the electronic delay switches (ELKAY) etc. Ensure they don't react with any electronic ballasts in your fittings, best stick with the Columbus type.

 
Top