Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
CU 15m away from meter
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="PIP IOM" data-source="post: 160524" data-attributes="member: 6880"><p>Cheers guys</p><p></p><p>This is our future home so cost does'nt come into it re safety, I was just a bit confused (as usual) re the requirement 30ma/11ma - tails/SWA -MET siting.</p><p></p><p>It is looking like a 3core 25mm SWA (potential future holiday let chalet/aptmnt fed from main CU so 16mm not enough) from small CU back to back with outside box.</p><p></p><p>I take it is SWA into adaptable box cores through to small CU (main earth jointed in adaptable box?</p><p></p><p>Appreciate both views on TT, the key remark is installed/tested correctly.</p><p></p><p>With there being no testing/certing at all over here until recently virtually every TT job you need to price has to have the, if the earth/bonding is OK, clause built in. I always test a few Zs but parallel paths can make it hit and miss.</p><p></p><p>Virtually every job will have just had a rod belted in and connected.</p></blockquote><p></p>
[QUOTE="PIP IOM, post: 160524, member: 6880"] Cheers guys This is our future home so cost does'nt come into it re safety, I was just a bit confused (as usual) re the requirement 30ma/11ma - tails/SWA -MET siting. It is looking like a 3core 25mm SWA (potential future holiday let chalet/aptmnt fed from main CU so 16mm not enough) from small CU back to back with outside box. I take it is SWA into adaptable box cores through to small CU (main earth jointed in adaptable box? Appreciate both views on TT, the key remark is installed/tested correctly. With there being no testing/certing at all over here until recently virtually every TT job you need to price has to have the, if the earth/bonding is OK, clause built in. I always test a few Zs but parallel paths can make it hit and miss. Virtually every job will have just had a rod belted in and connected. [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
CU 15m away from meter
Top