Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
Disconnecting bonding with supplementary paths?
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="boltonsparky" data-source="post: 503719" data-attributes="member: 4678"><p>Disconnect bonding conductor at MET, long lead test to the pipe/structure, not the clamp, this way you are checking the effectiveness/continuity of the connection of the clamp to pipe/structure. If there is any doubt that the bonding conductor isn't continuous or is unidentifiable at the MET and the reading you'e getting is a parallel path disconnect at both ends and perform long lead test. Very low reading you have the correct cable, an open circuit you have the other cable. You disconnect them at the MET to test to rule out the parallel paths you mention. You need to be ensuring the reading/connection is via the 10mm cable not the 1.5mm CPC of the boiler circuit. However the reading you get should confirm this anyway, the 10mm will be a much lower reading than that of a 1.5mm cpc parallel path. Anything over 0.05 ohms for a bonding conductor should be investigated. </p><p></p><p>Having a reading from the MET to every accessory and piece of fixed equipment, as you mention is correct, unless they're class 2. An earth reading will be being got at sinks etc through the taps from the copper pipe work via the main extraneous bonding conductors. Disconnecting bonding conductors is still likely to get you an earth reading although a slightly higher one through the CPC of the circuit to the connection of the boiler/heating/immersion through their connection to the pipework of the house. </p></blockquote><p></p>
[QUOTE="boltonsparky, post: 503719, member: 4678"] Disconnect bonding conductor at MET, long lead test to the pipe/structure, not the clamp, this way you are checking the effectiveness/continuity of the connection of the clamp to pipe/structure. If there is any doubt that the bonding conductor isn't continuous or is unidentifiable at the MET and the reading you'e getting is a parallel path disconnect at both ends and perform long lead test. Very low reading you have the correct cable, an open circuit you have the other cable. You disconnect them at the MET to test to rule out the parallel paths you mention. You need to be ensuring the reading/connection is via the 10mm cable not the 1.5mm CPC of the boiler circuit. However the reading you get should confirm this anyway, the 10mm will be a much lower reading than that of a 1.5mm cpc parallel path. Anything over 0.05 ohms for a bonding conductor should be investigated. Having a reading from the MET to every accessory and piece of fixed equipment, as you mention is correct, unless they're class 2. An earth reading will be being got at sinks etc through the taps from the copper pipe work via the main extraneous bonding conductors. Disconnecting bonding conductors is still likely to get you an earth reading although a slightly higher one through the CPC of the circuit to the connection of the boiler/heating/immersion through their connection to the pipework of the house. [/QUOTE]