Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
Earthing home PV/battery system for use in power cuts
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Gian" data-source="post: 527045" data-attributes="member: 33562"><p>As I have been advised in small generators up to 10kw that the Genny it's self must be linked at the Genny end . Neutral CPC link and a permeant sign not to use other than with Genny. And the Genny then connects as TT. This will allow the RCD protection to work using the change over switch as you have said it's the live and neutral that's used.</p></blockquote><p></p>
[QUOTE="Gian, post: 527045, member: 33562"] As I have been advised in small generators up to 10kw that the Genny it's self must be linked at the Genny end . Neutral CPC link and a permeant sign not to use other than with Genny. And the Genny then connects as TT. This will allow the RCD protection to work using the change over switch as you have said it's the live and neutral that's used. [/QUOTE]
Insert quotes…
Verification
Post reply
Green Renewable Energy Forum
Solar PV Forum
Earthing home PV/battery system for use in power cuts
Top