Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
Electric Meter Questions!
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="jon11a" data-source="post: 364341" data-attributes="member: 24566"><p>Only a couple of posts to go before I can post a picture. I think you are right though slipshod. The meters are connected to a rectangular box. The last engineer explained that in that box there was a live plate that they were connected to and he felt it would be too dangerous to deal with.</p><p></p><p>I think the bank are okay with us turning off supply if it's arranged in advance. Trouble is trying to arrange a suitable time for the bank and then getting an engineer out who knows what he's dealing with to do it properly. We had at least two attempts with the banks cooperation, getting out of hours cover etc but then the suppliers engineers saying it was too much of a job.</p><p></p><p>I'll post pictures as soon as I'm able to.</p></blockquote><p></p>
[QUOTE="jon11a, post: 364341, member: 24566"] Only a couple of posts to go before I can post a picture. I think you are right though slipshod. The meters are connected to a rectangular box. The last engineer explained that in that box there was a live plate that they were connected to and he felt it would be too dangerous to deal with. I think the bank are okay with us turning off supply if it's arranged in advance. Trouble is trying to arrange a suitable time for the bank and then getting an engineer out who knows what he's dealing with to do it properly. We had at least two attempts with the banks cooperation, getting out of hours cover etc but then the suppliers engineers saying it was too much of a job. I'll post pictures as soon as I'm able to. [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
Electric Meter Questions!
Top