Electronics technician looking for advice
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Gezmonder" data-source="post: 527117" data-attributes="member: 35058"><p>I was recently quoted 2.5k for installation of a small 2.4kw solar system plus ~10kwh battery system. No scaffolding required on an easily accessible flat garage roof.</p><p></p><p>Having trained and working as an electronics technician back in the day and years doing basic electrical DIY at home, I am quite happy to do this work myself and have a quote for kit ready to pull the trigger on, then I started reading about these DNO regs. I've zero interested on exporting out to the grid I just want to charge from it off peak and use solar to top it up during the day.</p><p></p><p>Am I going to be permitted to do this not having any registrations or relevant qualification? Seeing G98,99 and 100 applications all over the place on here.</p></blockquote><p></p>
[QUOTE="Gezmonder, post: 527117, member: 35058"] I was recently quoted 2.5k for installation of a small 2.4kw solar system plus ~10kwh battery system. No scaffolding required on an easily accessible flat garage roof. Having trained and working as an electronics technician back in the day and years doing basic electrical DIY at home, I am quite happy to do this work myself and have a quote for kit ready to pull the trigger on, then I started reading about these DNO regs. I've zero interested on exporting out to the grid I just want to charge from it off peak and use solar to top it up during the day. Am I going to be permitted to do this not having any registrations or relevant qualification? Seeing G98,99 and 100 applications all over the place on here. [/QUOTE]