Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
Exporting earth on TT system
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="binky" data-source="post: 26615" data-attributes="member: 490"><p>No liability is liabilty, which is what we take on every time we start a job, and hence should be charging for.</p><p></p><p>What I was trying to get at is that cost is always an issue even to the people who write the regs / legislation in the first place. And to cover their liability they tend to over state what is required to cover all possible likely events around the country, hence most of the standards tend to over state what is actually required as a catch all/ cover all, fall back position. Therefore compliance with regs is all that is needed and not adding to them eg using 10mm cable when 6mm is sufficient.</p><p></p><p>Hope I've made that clearer, I did type the previous post whilst half asleep:z</p><p></p><p>Now I'm typ[ing after a few of these Guiness Drink <img src="data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7" class="smilie smilie--sprite smilie--sprite1" alt=":)" title="Smile :)" loading="lazy" data-shortname=":)" /> before going back to :z</p></blockquote><p></p>
[QUOTE="binky, post: 26615, member: 490"] No liability is liabilty, which is what we take on every time we start a job, and hence should be charging for. What I was trying to get at is that cost is always an issue even to the people who write the regs / legislation in the first place. And to cover their liability they tend to over state what is required to cover all possible likely events around the country, hence most of the standards tend to over state what is actually required as a catch all/ cover all, fall back position. Therefore compliance with regs is all that is needed and not adding to them eg using 10mm cable when 6mm is sufficient. Hope I've made that clearer, I did type the previous post whilst half asleep:z Now I'm typ[ing after a few of these Guiness Drink :) before going back to :z [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
Exporting earth on TT system
Top