Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrical Inspection & Testing Forum
fault finding
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Handy" data-source="post: 37816" data-attributes="member: 2382"><p>AM2 , acheivement measurement 2.</p><p></p><p>Under city and guilds , apprentices sit 2 AM tests . An AM1 and AM2 , an AM1 is usually sat after the first year and is used to check basic circuit knowledge and clipping t+e , bending radii etc .</p><p></p><p>AM2 involves a complete installation within a set timeframe , with conduit , trunking , tray , MICC , armoured cable three phase motor with local and remote stop/start . Fault finding an installation , safe isolation of supplies and an audio / visual circuit to be drawn from a description (a kind of nurse call system , press button A and lamp B and buzzer c energise , sort of thing) and wired to function as per spec . Usually over 4 or 5 days .</p><p></p><p>Inspection and testing was a different course and not included when I did it . May have changed a bit now .</p></blockquote><p></p>
[QUOTE="Handy, post: 37816, member: 2382"] AM2 , acheivement measurement 2. Under city and guilds , apprentices sit 2 AM tests . An AM1 and AM2 , an AM1 is usually sat after the first year and is used to check basic circuit knowledge and clipping t+e , bending radii etc . AM2 involves a complete installation within a set timeframe , with conduit , trunking , tray , MICC , armoured cable three phase motor with local and remote stop/start . Fault finding an installation , safe isolation of supplies and an audio / visual circuit to be drawn from a description (a kind of nurse call system , press button A and lamp B and buzzer c energise , sort of thing) and wired to function as per spec . Usually over 4 or 5 days . Inspection and testing was a different course and not included when I did it . May have changed a bit now . [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Electrical Inspection & Testing Forum
fault finding
Top