Hi all just thought i would post my first thread and say hello , i'm a second year apprentice in east mids.
How many of you sparks when changing a consumer unit to 17th go through the old installation and change the old green cpc sleeving to green/yellow and if switch wire sleeving is missing or is old sparky red tape replace with new sleeving. At the moment the i'm firm with have got alot of cu upgrades and we do a peroidic first to see how bad/good installation is but other apprentices at college reckon they don't think you have to bother just put it on EIC as does tuter.
How many of you sparks when changing a consumer unit to 17th go through the old installation and change the old green cpc sleeving to green/yellow and if switch wire sleeving is missing or is old sparky red tape replace with new sleeving. At the moment the i'm firm with have got alot of cu upgrades and we do a peroidic first to see how bad/good installation is but other apprentices at college reckon they don't think you have to bother just put it on EIC as does tuter.