Hi,
My system is installed, and now I need to complete the form attached, and send in a schematic etc.
Hopefully I have the correct form, my system is an existing 3.68kw system installed in 2015, and my Victron system (PV with DC battery) installed recently.
Presumably I need to list both systems on that form, as I did for the G99 application last year?
On page 3 under information to be enclosed it states "As installed Standard Application Form data, unless already provided", what is this?
Do I need to fill out part 2?
My system is installed, and now I need to complete the form attached, and send in a schematic etc.
Hopefully I have the correct form, my system is an existing 3.68kw system installed in 2015, and my Victron system (PV with DC battery) installed recently.
Presumably I need to list both systems on that form, as I did for the G99 application last year?
On page 3 under information to be enclosed it states "As installed Standard Application Form data, unless already provided", what is this?
Do I need to fill out part 2?