How do i connect storage battery's to my existing system.
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="MHarv" data-source="post: 537165" data-attributes="member: 34994"><p>If you change out for Hybrid inverter you will have to notify DNO first; legal obiligation in the ENREC G98 document, Form D and apply again for G98 with the new G98 application.. easier to contact DNO before buying and installing batteries to get prior approval confirmation from them so they can verify the local area for Connecting extra Generation. </p><p></p><p>Most DNO’s have G99 Fast Track application <7.36kWh limit for G98 and G99 Type Tested ENA Register manufactures Reference Number to add Battery Storage to existing G98<3.68kWh capacity. </p><p></p><p>For larger inverters on G99 Fast Track requires the Full G99 application Form</p><p>Will still require E100 ELS Form (Export Control) Declaration for Type Tested ENA Register Approved Inverters for both both G99 Fast Track and Full G99.</p><p></p><p>You yourself can apply and fill in the Application Form for G99 Fast Track</p><p></p><p></p><p>Check out ITS Technologies website very competing prices depending on budget</p></blockquote><p></p>
[QUOTE="MHarv, post: 537165, member: 34994"] If you change out for Hybrid inverter you will have to notify DNO first; legal obiligation in the ENREC G98 document, Form D and apply again for G98 with the new G98 application.. easier to contact DNO before buying and installing batteries to get prior approval confirmation from them so they can verify the local area for Connecting extra Generation. Most DNO’s have G99 Fast Track application <7.36kWh limit for G98 and G99 Type Tested ENA Register manufactures Reference Number to add Battery Storage to existing G98<3.68kWh capacity. For larger inverters on G99 Fast Track requires the Full G99 application Form Will still require E100 ELS Form (Export Control) Declaration for Type Tested ENA Register Approved Inverters for both both G99 Fast Track and Full G99. You yourself can apply and fill in the Application Form for G99 Fast Track Check out ITS Technologies website very competing prices depending on budget [/QUOTE]