During an inspection it was observed that twin flush sockets were installed on a finished engineering brick wall.
The installer had simply left a half brick space for each socket resulting in no proper landing for the over-sized space.
How would you remedy this?
The installer had simply left a half brick space for each socket resulting in no proper landing for the over-sized space.
How would you remedy this?