Flying Scotsman
Electrician
- Joined
- Feb 15, 2008
- Messages
- 468
- Reaction score
- 0
7 twin sockets in a computer room,
fused connection unit for bathroom fan
bathroom fan (not supplied by me)
2 pendants
1 batten holder
4 twin sockets in kitchen
4 fused spurs in kitchen
under cabinet lighting
16 downlights (not supplied by me either
kitchen fan (hole and fan supplied by builder just had to install spur and flex into it) ALL ABOVE IS JUST THE SECOND FIX FIRST FIX DONE ALREADY
plasma tv and aerial feeds x 2 plus tidy up aerial wiring in loft,
install 3 cat 6 points in computer room.
Test the work.
install 3 outdoor lanterns, outsode light in entry way (bulkhead) and flood light on manual override.plus spur and 3 gang switch, 2 way lighting for 2 circuits for celing spots in kitchen and utility
and write the cert out
how much sensible, oh and by the way this builder gives me all his work
fused connection unit for bathroom fan
bathroom fan (not supplied by me)
2 pendants
1 batten holder
4 twin sockets in kitchen
4 fused spurs in kitchen
under cabinet lighting
16 downlights (not supplied by me either
kitchen fan (hole and fan supplied by builder just had to install spur and flex into it) ALL ABOVE IS JUST THE SECOND FIX FIRST FIX DONE ALREADY
plasma tv and aerial feeds x 2 plus tidy up aerial wiring in loft,
install 3 cat 6 points in computer room.
Test the work.
install 3 outdoor lanterns, outsode light in entry way (bulkhead) and flood light on manual override.plus spur and 3 gang switch, 2 way lighting for 2 circuits for celing spots in kitchen and utility
and write the cert out
how much sensible, oh and by the way this builder gives me all his work