my boss sent me on a job today to put 6 down lights in a bathroom, dont normally do a lot of down lights.
anyway my plan was to take the pendant down connect all cables from the pendant into a 20a 4w jb in the loft then loop out to the down lights.
i know there are a lot of mixed feelings about being able to access jb's...so would you say the way i was planning on doing the job is ok or is there a better way?
cheers
anyway my plan was to take the pendant down connect all cables from the pendant into a 20a 4w jb in the loft then loop out to the down lights.
i know there are a lot of mixed feelings about being able to access jb's...so would you say the way i was planning on doing the job is ok or is there a better way?
cheers