Hello all,
Just a quick question, doing a cu change and got to bond gas and water. The cu is on the front wall of the house and the gas and water are on the rear wall of the house, can I just run 1 cable to the gas first then to the water? I think I can as long as its a continual cable with the insulation removed for the clamp on the gas but would be grateful if someone could confirm. I can't find the bonding for gas or water anywhere in the house although there are cables leaving the MET which I presume are for them so guess it must be under the floor boards somewhere.
Just a quick question, doing a cu change and got to bond gas and water. The cu is on the front wall of the house and the gas and water are on the rear wall of the house, can I just run 1 cable to the gas first then to the water? I think I can as long as its a continual cable with the insulation removed for the clamp on the gas but would be grateful if someone could confirm. I can't find the bonding for gas or water anywhere in the house although there are cables leaving the MET which I presume are for them so guess it must be under the floor boards somewhere.