Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
MC4 for PV Systems
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="ISSWWW" data-source="post: 187234" data-attributes="member: 4583"><p>From all the information i have from talking to the manufactures it is only the Panels and the installer that need MCS accreditation.</p><p></p><p>This is an extract from an informed source;</p><p></p><p>To comply with the governments new FIT (Feed In Tariff) scheme Solar PV installations have to be carried out by an MCS (Microgeneration Certification Scheme) approved contractor and the Photovoltaic panels (Solar Panels) must be MCS approved, however the other parts of the installation DO NOT have to be MCS approved, this includes the Grid-Tie Inverter, Cabling, Solar PV Frame Work &amp; Other electrical items deemed necessary.</p><p></p><p>As above</p><p></p><p>I am going to stock tools and tool kits.</p><p></p><p>Since my origional post i have decided to stock both Multi Contact and Amphinol connectors and tools.</p><p></p><p>Orders have been placed and should have the stock very shortly.</p><p></p><p>.</p></blockquote><p></p>
[QUOTE="ISSWWW, post: 187234, member: 4583"] From all the information i have from talking to the manufactures it is only the Panels and the installer that need MCS accreditation. This is an extract from an informed source; To comply with the governments new FIT (Feed In Tariff) scheme Solar PV installations have to be carried out by an MCS (Microgeneration Certification Scheme) approved contractor and the Photovoltaic panels (Solar Panels) must be MCS approved, however the other parts of the installation DO NOT have to be MCS approved, this includes the Grid-Tie Inverter, Cabling, Solar PV Frame Work & Other electrical items deemed necessary. As above I am going to stock tools and tool kits. Since my origional post i have decided to stock both Multi Contact and Amphinol connectors and tools. Orders have been placed and should have the stock very shortly. . [/QUOTE]
Insert quotes…
Verification
Post reply
Green Renewable Energy Forum
Solar PV Forum
MC4 for PV Systems
Top