Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
meter arangements
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="SLIPSHOD &amp; SLAPDASH" data-source="post: 7149" data-attributes="member: 16"><p>Oh no they wont. You (as the customer) has to fit trunking, meter boards etc where needed ie, a block of flats. None of this needed on a single supply.</p><p></p><p>The mounting heights for their equipment (cutout, meters, time-switches, Ryfield etc is, maximum 1800mm and Minimum 450mm.</p><p></p><p>The space needed for the metering equipment is 350W, 320H &amp; 300D. Although some paperwork from the old Seeboard area (South London) now allows you to stack the time-switch and meter. You could take a chance on not allowing space for a time-switch (for off peak etc) but you only need a jobsworth ( and EDF around here seem to employ all of them) to not connect. 150mm trunking is asked for if 3 phase ( We recently found out you can not get 27 16mm 6491x in a 100mm trunking (9 flats, live, neutral and earth) If its 3 phase and keymeters are fitted , the head and/or Ryfield have to be separately locked away.</p></blockquote><p></p>
[QUOTE="SLIPSHOD & SLAPDASH, post: 7149, member: 16"] Oh no they wont. You (as the customer) has to fit trunking, meter boards etc where needed ie, a block of flats. None of this needed on a single supply. The mounting heights for their equipment (cutout, meters, time-switches, Ryfield etc is, maximum 1800mm and Minimum 450mm. The space needed for the metering equipment is 350W, 320H & 300D. Although some paperwork from the old Seeboard area (South London) now allows you to stack the time-switch and meter. You could take a chance on not allowing space for a time-switch (for off peak etc) but you only need a jobsworth ( and EDF around here seem to employ all of them) to not connect. 150mm trunking is asked for if 3 phase ( We recently found out you can not get 27 16mm 6491x in a 100mm trunking (9 flats, live, neutral and earth) If its 3 phase and keymeters are fitted , the head and/or Ryfield have to be separately locked away. [/QUOTE]