Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrical Inspection & Testing Forum
Nice little "Real World" bonding question?
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Apache" data-source="post: 16612" data-attributes="member: 828"><p>Apache's (amature answer)</p><p></p><p>I think the water should be bonded before it tees (1)</p><p></p><p>I thought the bonding should be 10mm (2)</p><p></p><p>I thought bonding had to be back to CU (3)</p><p></p><p>Of the 2 clamps under the sink is 1 of those to the CU (cold) and the one on the hot to the gas? If hot and cold not continuous then gas not connected back to CU? There's only 1 wire from each clamp. (4)</p><p></p><p>We have a missing warning label on the hot clamp and the gas clamp (5 &amp; 6)</p><p></p><p>Thought the main bonding was supposed to be in 1 continuous run? (7)</p><p></p><p>Ok apache thinks 7 faults - To mend it, run 10mm from gas to cold water (before it T's) back to CU. Clamps with their warnings on etc. Then test as appropriate <img src="data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7" class="smilie smilie--sprite smilie--sprite1" alt=":)" title="Smile :)" loading="lazy" data-shortname=":)" /> </p><p></p><p>CU not complient with 17th but don't think you mean that in your non-complience section.</p><p></p><p>How did I do? <img src="data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7" class="smilie smilie--sprite smilie--sprite8" alt=":D" title="Big grin :D" loading="lazy" data-shortname=":D" /></p></blockquote><p></p>
[QUOTE="Apache, post: 16612, member: 828"] Apache's (amature answer) I think the water should be bonded before it tees (1) I thought the bonding should be 10mm (2) I thought bonding had to be back to CU (3) Of the 2 clamps under the sink is 1 of those to the CU (cold) and the one on the hot to the gas? If hot and cold not continuous then gas not connected back to CU? There's only 1 wire from each clamp. (4) We have a missing warning label on the hot clamp and the gas clamp (5 & 6) Thought the main bonding was supposed to be in 1 continuous run? (7) Ok apache thinks 7 faults - To mend it, run 10mm from gas to cold water (before it T's) back to CU. Clamps with their warnings on etc. Then test as appropriate :) CU not complient with 17th but don't think you mean that in your non-complience section. How did I do? :D [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Electrical Inspection & Testing Forum
Nice little "Real World" bonding question?
Top