Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
Peak And Off Peak Submain Isolation
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="ProDave" data-source="post: 354564" data-attributes="member: 6969"><p>The norm is a dual rate meter with a built in time switch. Gone are the days of separate meter and time clock.</p><p></p><p>So you want to run TWO submains from the meter point to the two cu't in the flat. Each will need over current protection and isolation so two switch fuses would do the job. Make sure the cable run / type does not need RCD protection.</p><p></p><p>The whole house gets metered at the cheap rate at night, but only the off peak CU is actually energised.</p></blockquote><p></p>
[QUOTE="ProDave, post: 354564, member: 6969"] The norm is a dual rate meter with a built in time switch. Gone are the days of separate meter and time clock. So you want to run TWO submains from the meter point to the two cu't in the flat. Each will need over current protection and isolation so two switch fuses would do the job. Make sure the cable run / type does not need RCD protection. The whole house gets metered at the cheap rate at night, but only the off peak CU is actually energised. [/QUOTE]