Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrician Talk Forum
Question for the hive mind.
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="mort2376" data-source="post: 556799" data-attributes="member: 25787"><p>Final outcome. 2 thermostats one for bedrooms one for living areas. Im cutting fast fix single box behind panel, running 2.5 from each panel back to immersion cupboard. Joining 2.5 twin and earth with 20a (I call them click plug and sockets) to panel heater flex. Blank plate with side flex entry to cover the holes.</p><p></p><p>2 x jointboxes in immersion cupboard at high level one for each zone. Max load on each zone is 2kw so installing 2 16a circuits. Controls fed via a 13a switched fused spur for local isolation in cupboard.</p><p></p><p>Now have to put together a twin immersion control with a timer for the off peak as its being converted to an off peak supply but only 1 board and so doing the main immersion via a hidden away timer to turn on and off at off peak times.</p><p></p><p>Boost immersion to be controlled via a 1-3 hr boost time control.</p><p></p><p>Ill post pics of the final job.</p></blockquote><p></p>
[QUOTE="mort2376, post: 556799, member: 25787"] Final outcome. 2 thermostats one for bedrooms one for living areas. Im cutting fast fix single box behind panel, running 2.5 from each panel back to immersion cupboard. Joining 2.5 twin and earth with 20a (I call them click plug and sockets) to panel heater flex. Blank plate with side flex entry to cover the holes. 2 x jointboxes in immersion cupboard at high level one for each zone. Max load on each zone is 2kw so installing 2 16a circuits. Controls fed via a 13a switched fused spur for local isolation in cupboard. Now have to put together a twin immersion control with a timer for the off peak as its being converted to an off peak supply but only 1 board and so doing the main immersion via a hidden away timer to turn on and off at off peak times. Boost immersion to be controlled via a 1-3 hr boost time control. Ill post pics of the final job. [/QUOTE]