Why is there a 3kW limit on the battery output? I have seen that and wondered if it was a setting or an equipment limitation.
Also, if I needed to shut the system down, I believe the correct order is isolate panels first, then link to fuse board, then batteries. Is that correct? I have some tiles being replaced and they’ve requested the panels be isolated.