Alright lads, been asked by mate who subs work out to me to pre work survey a job to install a supply to granny flat 30 meters away from main house feeding a CU contaning ;
1 Ring circuit (3x ssockets kitchen;3x sockets liv.rm.;2xsocketsbed.)
1 Lighting circuit(5 points)
1 Shower (8.5kw)
1 Cooker circuit(to be chose)
Using my OSG for diversity and corrections I get total demand at about 71a?
This seems high to me so maybe I am missing somthing.
Also is it correct to feed the granny flat in 16mm SWA buried going by Table 4
D4A in regs and making flat TTearthing system.
Be gentle with answers please chaps, first time I have left to do first calculations.
Big thanks in advance for any help posted TA.
1 Ring circuit (3x ssockets kitchen;3x sockets liv.rm.;2xsocketsbed.)
1 Lighting circuit(5 points)
1 Shower (8.5kw)
1 Cooker circuit(to be chose)
Using my OSG for diversity and corrections I get total demand at about 71a?
This seems high to me so maybe I am missing somthing.
Also is it correct to feed the granny flat in 16mm SWA buried going by Table 4
D4A in regs and making flat TTearthing system.
Be gentle with answers please chaps, first time I have left to do first calculations.
Big thanks in advance for any help posted TA.