- Joined
- Mar 28, 2008
- Messages
- 14,293
- Reaction score
- 944
As is often the case,
loads and loads of installtions have no indication of when or if they were last inspected...
Whenever I come across a CU with no periodic insp' label
(as per 514-12-01 or 514.12.1.. whichever notation you prefer?)
Say on some minor works or when or small changes requiring EIS are done.
(not a rewire or CU change)
I put a label on the CU and write
'Unknown' in the last insp date.
and 'A.S.A.P. in the recommended next insp date.
Just wondering what approach others take.. :|
Leave it do nothin / Put label leave blank / put label best guess dates? ?:|
SL
loads and loads of installtions have no indication of when or if they were last inspected...
Whenever I come across a CU with no periodic insp' label
(as per 514-12-01 or 514.12.1.. whichever notation you prefer?)
Say on some minor works or when or small changes requiring EIS are done.
(not a rewire or CU change)
I put a label on the CU and write
'Unknown' in the last insp date.
and 'A.S.A.P. in the recommended next insp date.
Just wondering what approach others take.. :|
Leave it do nothin / Put label leave blank / put label best guess dates? ?:|
SL