Hi, I have recently built an out building and had it boarded and plastered, I was trying to be clever by wiring it before it was boarded. I have run standard 3 core cable from a power point to where I want a light switch, and then another length of standard 3 core cable from where I want the switch to where I want the light fitting. I was going to put a plug on the end and plug it into the power point (obviously supplying me with the power) but Im not too sure how to wire the light and switch in!! - Is there a way I can do this based on the wiring i have already put in??? Many thanks. Darren.