Just completed a eicr i found connections in a light fitting had not been terminated correctly and had copper visable from outside the terminal.
Far as i was away and taught that would be a c2 but im being told that its a c3 by other electrcians. Wandering what everyones opinion on this is i have tried to look it up to get a definitive decsion but everyone seems to have different opinions.
There is about 4mm of copper showing
(Was not fixed on job apon landlords request to come back to him before work is done)
Far as i was away and taught that would be a c2 but im being told that its a c3 by other electrcians. Wandering what everyones opinion on this is i have tried to look it up to get a definitive decsion but everyone seems to have different opinions.
There is about 4mm of copper showing