Recent content by skillsassessor

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. skillsassessor

    Yell.com

    Thank you, very helpful and much appreciated. Cheers
  2. skillsassessor

    Yell.com

    Hi , Has anybody used Yell.com for either their website building and hosting service and also for advertising on Yell.com itself ? I am looking to get my own website, register a domain name and then sign up with an advertising site to hopefully start getting more leads to grow my business (...
  3. skillsassessor

    Integral Programmers

    Any thoughts on installing an integral programmer with a digital RF thermostat such as the Worcester DT20 to a combi boiler installed in an up-stairs airing cupboard ? Are there any issues with complying with building regs etc as the programmers may be considered inaccessible compared to wiring...
  4. skillsassessor

    High Rise Flats Communal Aerial Supply.

    It will be down to the aerial company to install the new aerial supplies to the two flats including the drilling works. The existing service ducts are full. What I wanted to no is it possible to "tap off" an adjacent flats aerial input supply or is the only way to run cables up to the roof...
  5. skillsassessor

    High Rise Flats Communal Aerial Supply.

    Hi, I have been asked to meet an aerial engineer at one of our 7 storey flats on Monday, the 43 flats share a communal aerial system on the roof. The old community room has now been converted in to two ground floor flats, we need to connect these properties to the communal system. Can this be...
  6. skillsassessor

    Lighting Levels In Offices

    Hi, is there an specified lux level for artificial lighting in an office attached to a warehouse. There,s one small window to the outside letting in natural light. Electrician  measured the light level today at 1pm and it was 500 lux per m. Clients surveyor has stated the lighting is not...
  7. skillsassessor

    Exporting A Pme Suuply To Steel Shipping Containers

    Hi, I have been asked to run in a temporary ( 6 months duration ) 16mm 3 core SWA cable to a sub-board in a metal shipping container currently being used as a site compound office / canteen etc. The supply is from the  communal area of an housing associations low rise flats( adjacent to the...
  8. skillsassessor

    Part P 6Th April 2013

    Hi All, Now the new Approved Document Part P is in force it states notifiable works can be certificated by a" Registered third party certifier". Does anyone have any clarity on what this actually means i.e can a part P registered electrician now sign off say his mates or another electricians...
  9. skillsassessor

    Eddy Currents

    Thanks for the replies, Line and neutral will go together through one hole, can the main earth then go through a separate hole without the need for a saw cut ? ( it will fit with the L&N but was asking for ease of installation and neatness ) Thanks
  10. skillsassessor

    Eddy Currents

    Hi, A question I was asked the other day, does the line and neutral mains tails and main earth all have to go through the same hole in a single phase metallic consumer unit or can the neutral and main earth go through another knock out hole and use some form of nylon stuffing gland ? ( Assume...
  11. skillsassessor

    Be posting soon level 2 2330 unit 202 and 203

    Thankyou for the time you took to up-load all this information, i,m sure it will be of help to many people. :)
Top