You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser.
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate
links, including eBay, Amazon, and others.
-
-
W
No mate, no spec its a small office refurb with a lazy landlord
-
W
@fleetin
Ok got you, so i’d put my switch wire from my LCM in the common of the Key switch doubled up with the supply from the board...
-
W
Got it thanks mate, so i’d put my switch wire to my LCM in the common of the Key switch doubled up with the supply from the board (so...
-
W
most em lights you only need to switch the perm side. switching the sl will also switch off all other non emergency and is the lazy non...
-
W
The test facility only need interrupt the permanent line. BS5266 states the test facility should not introduce a hazardous situation...
-
W
Hi Guys,
So i’m wiring LCM lights with emergency fittings and PIRs.
I have a 4 core supply going straight to the LCM box, then the PIR...
-
Loading…
-
Loading…