Hi guys
Been given the paperwork and info for our Level 2 204 Application Of Health And Safety.
Basically we have a 3 phase star set up/rig. Supply is 110v. Each phase has a 60W bulb and a 100W bulb.
Been told we must estimate beforehand VL, VP, IL, IP and Total Power, Apparent Power and the...