So should I run 3core+E 1m from existing switch to sensor, then T&E 1m from sensor to new switch then T&E 1m from new switch to lights, would that work? And the new switch, would that just be a 1gang 1way switch out of toolstation etc? Would that mean the new switch would always be of...