Kurdish. I didnt remove any lids, tenant says its been like this since he moved in 6 months ago
Maybe the pallet was 'A Barrier' as listed on some inspections, but someone moved it 😁
Not seen any lead sheathed cable still in service for a while now
This is how i found the cut out when i opened the understairs cupboard
Main earth connection. Looked like 2.5 (but imperial) cable. Got 0.34 Ze
One of the boards. Nice size tails
Saw this on a job yesterday, stll in use and working.well, working on mains as i think the battery had passed its best. From the rest of the house i recon this was installed mid 70,s
Good point. As i have never seen a split phase installation i forgot about it. Its 460 V ? or is it now 440 with the 'harmonised' wording.
Even so, something is not correct wirh the 440 & 240v supplies
Do you know what your main fuse size is. It may say 60, 80 or 100 A on the outside, or it may say nothing or be wrong but it will give us a clue.
However it seems so far quite posdjble to run your whole house of one phase & meter
As mentioned above, this has been discussed many times.
The local isolator is fitted due to the risk of injury by the mechanical movement of the fan & not electric shock . This rule came about years ago in relation to much bigger bits of kit than the puney 100mm bathroom fans that...
I assume the viewing boxes are doors/traps/inspection hatch's that have been part of the gas regs for a couple of years now. All joints in a flue have to be accesible for inspection.
Hi Robin
Your descriptions are wrong for the phases. Any phase to neutral is 230v and between any 2 phases is 400v. No such thing as 440v single phase.
My own house sabt tamper activated at 1.15am this morn (and its .5 meter from our open bedroom window 🤐)
Its a Flashguard (XL from memory ) as its been up there 18 years & never touched it, along with the Castle Meridian panel just as long except that has had 1 new batt.
A few years back it was a boiler that told me there was reversed polarity on a whole job . Boiler locked out when new meters were fitted. Cant remember all the details but previous sparks had reversed cables but taped correct colours on tails. When the ends were cut off and reconnected...