In the EXTENT AND LIMITATIONS OF INSPECTION AND TESTING (Section D of the report), I put 25% of the installation in accordance with item 3.8.2 of Guidance Note 3. That is full testing and confirmation of circuits plus a random sample of items inspected.
I charge the work as a reduced EICR to...