I am on a 3 fase circuit at a kent hospital where they want 2 unipact drylon machines installed as a hybrid for the smaller ones should i use the 400 or 240?
I have an Elro ES360M motion sensor switch. It has 3 Cable connections. LS (Switched Live), L (Phase) and N (Neutral). My existing light switch has just the 2 cables red and black. How can I wire this device?