Search results

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. S

    Your thoughts ladies & gentlemen please

    Scenario. Elderly sparks rewires a flat. Is not part P and not 17th but been doing it all he's life. Work is to a high standard and if in doubt will ask. If I oversee the job and sign it off on a 3 part EIC. Myself doing the insp and test. In effect doing the job of building control. I know a...
  2. S

    Coast 2 Coast???

    Evenin all. Any one out there had dealings with a company called coast 2 coast ltd. Got a call today. A bit different from the usual but they still want
  3. S

    17th ED Top Up?

    Hi Guys. Just been told I've got to do my 17th by december. I have been putting it off cause of costs but now have to bite the bullet. Any of you guys used these on line coarses? If so are they any good and or can anyone recommend some. Seem to be be a lot cheaper than going to college...
  4. S

    downlights help

    Evening all. Got a quick one and hope someone can help me. I was browsing on here a while ago and somebody suggested a lighting manufacturer specialising in fire rated downlights called speedlight/safelight/ anyhow something light and for the life of me I cant remember who it was, but at the...
  5. S

    PIR, How much?

    Evening chaps, how much do you charge for a PIR. Cant seem to get it right. Two years ago I was charging
  6. S

    3p variable RCD

    Hi Guys. Got to look at a job on Tuesday and have a couple of questions. 1. Artificial ski ramp built into a hill. The top of the ramp is constructed with ply and timber joists supported by steel scaffold which is also acts as handrail. There is a small lockable store with lighting and power...
  7. S

    oven isolation??

    Hi Guys. Got a job on tuesday to supply two separate Miele ovens. Each oven is 3.6KW and because of the logistics of the kitchen I am going to use the existing 32 amp (6mm cable) supply which originally supplied the previous oven. The job was prepared before the ovens arrived with the...
  8. S

    exporting earth again!!!

    Gotta quote an outbuilding to be used as a office on a farm. The supply is from a 3ph DB with PME supply in barn. Sub main 60metres. Not aggrecultual and live stock not in this area so tracktor will excavate. No Probs!! Do I 2core and TT the outbuilding or 3 core and export the PME. What about...
  9. S

    Trade directories.Aaaarrgghhh

    Hi guys. This is my first time on here and hope some of you may help me with my dillema. Keep getting calls to join different trade directories, different rates, different charges etc etc. Not got much work on and it is very tempting. Any thoughts or suggestions would be most appreciated. l l
  10. S

    Hi Guys

    Been looking at the forum from time to time. Its looks good and fun. So hear I am. Antone used the UK Consumer Protection Agency????Applaud Smiley
Top