  1. V

    NVQ Course online.

    Hi lads, have been told by JIB that I wonT be able to renew my ECS card this year unless I complete a NVQ LEVEL 3 course. I have no problem with covering any of the work it entails just wnted to know if anyone knew of any online colleges I can take it from at a reasonable rate as the only ones...
  2. V

    Settle a argument over disconnection times.

    Wonder if a difference of opinion could be settled. A lad I work with was posed a question on a test "what is the maximum disconnection time in a 6a TN lighting circuit". The answer was given as 0.4 whilst I thought on that information available the answer would be 5s. ELECSA technical have...
  3. V

    20a cooker in 32a ring

    Just on a job adding sockets to a kitchen ring. I have noticed that the cooker switch in the ring supplying the oven is now going to be supplying a oven that will be drawing 20a max. Have not got my regs to hand so was not sure if this ok , does the oven need to be on its own circuit or will it...
  4. V

    Catering unit supply

    Hi all, have been decided to help my mate on a project of turning one of those American 50s style caravans into a catering unit. As this is my first time working on a caravan have been going through my BRB, GN and all the previous relavant posts I can find on here. Now the thing I cant figure...
  5. V

    Assessment success!

    Had my ELECSA assessment this morning and passed with an A :) Just want to say a big thank you to the forum and to the usual regulars who have took time out to any answer all of my (sometimes daft) questions. Nice one:worship
  6. V

    High Zs

    Was doing the final tests today on CU change for my ELECSA assessment tomorrow r1+r2 of the cicuits are ; Up ring .22 Down ring .20 Kitchen ring .36 Lights up .59 Lights down ..71 Cooker .10 Shower .13 Ze =0.09 Now when I have come measure the Zs to complete the EIC the results I am...
  7. V

    PFC Testing with a Kewtech KT45

    Have just bought the KT45 loop tester as my MFT is playing up performing this test, now when I am doing my Ze test and want to work out my PEFC is this done by the machine or will I have to calculate it. Sorry if this seems like a bit of a silly question but I think my MFT has made me lazy as...
  8. V

    Smokies from lighting circuit.

    Hvae run a couple of smoke alarms in from upstairs lighting circuit(fresh plastered walls so could not go back to CU) on the job I using for my assessment in a couple of weeks, shall I put this down on the EIC or would it be better to have it down on a MWC instead. ?
  9. V

    Finally taking the plunge.

    Have at last felt ready to book a part p assessment. Decided to go with ELECSA and got my confirmation today to have it on 8th of Feb. with Mr John Wormald. I have been looking through all the other threads for first time assessment tips (very helpful) but anyone with a recent one with any...
  10. V

    Coin Meter for a Dryer.

    Been asked a landlord on job if I will install a coin operated meter in a property in a drying room basically so the students dont just keep using the dryer 24/7. She has found one on flea-bay which when she showed me I was not impressed with, have told her I would look for a better one. Anyone...
  11. V

    4mm in a 2.5 ring

    Is it ok to have runs between sockets of a 2.5 ring in 4mm was on a job today where I have come across this. It looked like someone has added the 2.5 to a radial when adding to extension. Would the best solution be to seperate them bring back to CU seperatly. Thanks in advance for any thoughts.
  12. V

    Doubling up on multi-cores!!!

    Been asked to help out another spark on job which I wanted opinions before going in. They are feeding a small storage unit from a commercial lock up .When having a quick look noticed they have wired the feed (aprox 16 mts) into storage unit in 2.5 S.W.A 5 core. I said that thought that the...
  13. V

    Dual supply stickers.

    Following on from a thread discussed last week about putting a economy 7 supply and flat supply in one CU does anyone know where I can get a warning sticker to indicate dual supply or will I have to use my bestest writing:)
  14. V

    Board change with economy 7

    Been called to job today by builder we get regular work off to install shower in a flat refurb they were doing. Arrive at job to find it is a old Wylex rewireable fuse board 4 ways;5a lights,15a boiler,30a ring,45a cooker. Alongside this one is a board for economy 7 suppling 4 heaters 15a each...
  15. V

    combi supply

    Alright lads, bit of advice needed, doing a CU change for my assessment have also installed a new downstairs and kitchen ring(s). What is bothering me is that the combi in the kitchen was just plugged into a kitchen socket, so do I have to run in a dedicated circuit for the boiler(as stated in...
  16. V

    10mm Crimping Tool

    Need to buy crimping tool to extend a cooker point by a couple of meters , been searching the net the ones I have seen quite expensive so can anyone recommend one to me so at least the money I spend will be well spent. Thanks in advance for any help.
  17. V

    CU change for assessment.

    Alright gents, bit of advice needed in getting ready to change CU in my own house for a provider assessment probably with ELECSA. Tested house and all results are fine, will i have to put this on a PIR form or will they just want to see a EIC. As I will upgrading to a 17th board will I have...
  18. V

    Tip Commander ?

    Alright lads , Have been given a MFT by firm to do some testing for them this week. The machine is a brand called "Ethos" which seems very similar to Metrel easitest range. Packaged with it is a probe called a tip commamder which in manual it refers to as to be used for insulation testing...
  19. V

    Burnt out switches

    Had a job a couple of weeks ago at a block of flats where 45a electric central heating switch been badly burnt out, it seems the owner had changed a original switch that had a slight charring on it. All tests on the cable were fine so put it down to him being a DIYer and not terminating securely...
  20. V

    Dog retching

    A couple of mornings in the last couple of weeks my jack russell has been baulking in the mornings with a little bit of bile coming up, other than this he seems perfectly fine and we have not changed his diet in the last 5 yrs. Is this a sign of something a bit serious or another of his quirks...