Hello,
I have been asked to fit a secondary CU for an extension that has been built - 1 ring, 1 light.
Client does not want existing non RCD CU touching.
They only want a small new CU (just for extension)
Would you just fit something like a 4 or 6 way, with an RCD as main switch?
Or CU with switch, RCD and MCBs?
Or I know the most expensive way is CU with main switch and RCBO's (but why is the above is sufficient)?
Thanks.
I have been asked to fit a secondary CU for an extension that has been built - 1 ring, 1 light.
Client does not want existing non RCD CU touching.
They only want a small new CU (just for extension)
Would you just fit something like a 4 or 6 way, with an RCD as main switch?
Or CU with switch, RCD and MCBs?
Or I know the most expensive way is CU with main switch and RCBO's (but why is the above is sufficient)?
Thanks.