If you can get a box right upto the terminals of the meter, you could terminate into that then cores directly into meter?But what about the other end... the cutout end? Oracle.
No mate, RCDs tend to trip off on lamp failures.that would be MCB that trips. and if a lamp failing trips an MCB, then you have designed the system incorrectly (unless it has to be B type for EFLI). use a C6 and your done
cant say thats ever happened to me with standard GLS lampsNo mate, RCDs tend to trip off on lamp failures.
http://www.williamjamesantiques.co.uk/thumbnails/standard_lamp_full_view.jpgcant say thats ever happened to me with standard lampshad a few faulty ballasts that have shorted to earth, tripping RCD
standard - not standing!
With pacth on this one 6ft tall jobbies are standard lamps, however I'm sure some pen pusher has decided to change the name even though they have been called that for decades, kinda reminds me of the pc cultureno no - it is a standard lamp.
I would terminate SWA into a Merlin Gerin Enclosure fit a 63A Double Pole Mcb and then tails into link box.But what about the other end... the cutout end? Oracle.
binky & andy, your missing the point. Yes i agree that its better to have the Domestic smokes 'connected to a commonly used lighting circuit' the point is it doesn't say '& sockets' which would happen if you use a common Rcd. Lights rarely trip Rcd's , but socket circuits do. As i have said loads of time this should not be down to money. High integrity boards are available for this reason. A Rcbo costs as little as
Just for your info I am managing to RCBO's for
Enter your email address to join: